Barge load of panels for Sub Base in Bremerton, WA – loaded at Napa Pipe GPM handled the river transportation to and from Ocean Tug in Mare Island Vallejo.
0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *